Littoral Strike Ship offered.

https://ift.tt/px5TSbo In 2019, the RN was offered the Littoral Strike Ship, almost readily available on an affordable wet-lease charter. Instead, in 2022, it was decided to run RFA Argus past 2030 (at that point, 41 years old).  A closer look at the Littoral Strike Ship concept can be read on the link:  https://www.navylookout.com/a-closer-look-at-the-littoral-strike-ship-concept/ https://ift.tt/yjxuPSa