Replenishment-at-sea (RAS) operation between two French Navy ships: the Amiral Ronarc’h frigate (left) and the Jacques Chevallier supply ship (right). The Amiral Ronarc’h is the lead ship of the new FDI (Frégate de Défense et d’Intervention) class of frigates, delivered to the French Navy in October 2025.

https://ift.tt/jkPacxd   https://ift.tt/4Ds2bOa

Electric Boat has delivered the 26th Virginia-class SSN (Block IV), USS Idaho, the 2nd boat delivered to USN this year. The delivery comes as the industrial base works toward average build of 2.33 Virginias and 1 Columbia SSBN per year so the US can meet its AUKUS obligations. Future USS Idaho (SSN 799) Virginia-class Block IV nuclear-powered attack submarine moving from Electric Boat to Naval Sub Base New London in Groton, Connecticut after delivery to the Navy – December 15, 2025

https://ift.tt/6W52Gui   https://ift.tt/xcaJSmf

HMS Mauritius (C80), a Fiji-class light cruiser of the Royal Navy. It was built by Swan Hunter in Newcastle upon Tyne and commissioned on January 4, 1941. Scrap;ped in1965.

https://ift.tt/Er3vpwS   https://ift.tt/om3wegW

During December 1969, HMS Revenge, the final launch of the Resolution-Class ballistic missile submarines, was commissioned into the Royal Navy. Each of the class was armed with up to 16 Polaris nuclear missiles.

https://ift.tt/UnrMBFR   https://ift.tt/9GbR6n3

Future USS Oklahoma (SSN 802) Virginia-class Block V nuclear attack submarine now with pressure hull complete in Newport News, Virginia – posted December 16, 2025.

https://ift.tt/vFqeb35   https://ift.tt/i1qbROf